Construction

Construction invoices

Invoice an accepted quote as a deposit, a progress invoice or the final invoice, with VeriFactu.

On this page

A construction invoice always comes from an Accepted quote. See Construction quotes.

Issue an invoice

  1. In Works › Quotes, open the accepted quote.
  2. Tap Invoice and choose the invoice type.
  3. Check the amounts and tap Issue invoice.

From the till, the Invoice button creates the accepted quote and opens this screen straight away.

The invoice is sent to VeriFactu like any other invoice. It cannot be deleted, only corrected. The client needs a tax ID.

Invoice types

Type What it invoices
Deposit A % of the quote, before work starts
Progress How far the work has got, as a cumulative %
Final Everything left to invoice

Progress: enter the Overall progress (%) or a % per line. The % is cumulative: if you already invoiced 30 % and the job is at 50 %, the invoice covers the missing 20 %. With Deduct the invoiced deposit, the deposit is deducted in proportion.

Final: invoices what is left of each line and deducts the remaining deposit.

You can add a Note on the invoice.

What the invoice shows

  • The quote reference and the site address.
  • The 10 % VAT or reverse charge mention, when it applies.
  • The guarantee retention and IRPF, and the Amount due.

The quote shows Invoiced 50 % and becomes Invoiced at 100 %. Construction invoices are in Works › Invoices.

Cancel an invoice

Correct the invoice from the invoice list, like any other. What it covered can be invoiced again.

In the cash closing

The invoice counts as a sale in the Z closing of its day. Construction payments do not go into the till: see Sites and payments.

WhatsApp